Automation Readiness

The Automation Checklist.

Automation changes more than production speed. Before investing, review your space, electrical, air, freight access, dryer capacity, workflow and installation readiness so the equipment can actually perform once it reaches your floor.

AUTOMATION REALITY CHECK Your press is only one part of the system.
12–28 FT Common press diameter range
3PH Electrical is common on automation
5K–8K LB Forklift capacity may be required
23×31" Common automatic press screen size

Check Your Shop Before You Buy.

Most automation problems begin before production ever starts. Check off what is already handled and use anything unfinished as your planning list before equipment arrives.

YOUR READINESS 0 of 30 complete
01
FACILITY

Available Space

Why It Matters

Automatic presses can span roughly 12–28 feet in diameter, before accounting for dryers, carts, operators, staging and other departments.

02
INFRASTRUCTURE

Electrical Setup

Why It Matters

Electrical incompatibility is one of the easiest ways to delay installation and unexpectedly increase project cost.

03
INFRASTRUCTURE

Air + Compressor

Why It Matters

Automation needs stable pressure and clean, dry air. Undersized or moisture-heavy air systems can cause production problems and equipment damage.

04
RECEIVING

Forklift + Freight Access

Why It Matters

Freight carriers typically do not unload capital equipment. Many projects require a properly rated forklift and extensions ready before the truck arrives.

05
PRODUCTION

Dryer + Workflow

Why It Matters

Faster printing does not help if curing or downstream workflow becomes the new bottleneck.

06
PROJECT PLANNING

Installation + Training

Why It Matters

Installation is much smoother when utilities, funding, staffing and local trade support are coordinated before the technician arrives.

The Things That Usually Cause Problems.

01 Electrical Gets Expensive Fast

Verify voltage, phase and available amperage before equipment is purchased.

02 Air Systems Are Often Undersized

Plan compressor capacity around future equipment and accessories, not only today's demand.

03 The Dryer Becomes the Bottleneck

Your curing capacity needs to scale with the production speed of the press.

04 Workflow Matters More Than Size

Automation amplifies inefficiencies in staging, reclaim, approvals, loading and finishing.

05 Automation May Change Your Entire Department

Screens, darkroom setup, carts, inks, chemicals, software and scheduling may all need to evolve.

06 Know the ROI You're Buying For

Define the output, labor savings, revenue growth or workflow improvement the equipment should create.

PRINTABLE RESOURCE

Take the Checklist Into Your Shop.

Download the printable Automation Checklist and review it with your team, electrician, HVAC contractor, installer or production manager.

Space Planning Electrical Air Systems Forklift Access Dryer Capacity Install Prep
Download Printable PDF